Supercomputer
Colossus
Server racks inside the Colossus cluster in Memphis.
xAI's supercomputer in Memphis, Tennessee. Its first 100,000 Nvidia H100 GPUs came online in September 2024, 122 days after construction began; xAI's next, larger cluster in Memphis is called Colossus 2.
Colossus was built in a former Electrolux factory in south Memphis to train the Grok chatbot, and newer H200 and B200 GPUs were later added to the H100s. The grid connection was weak at first, so xAI brought in temporary gas turbines and Tesla Megapack batteries; residents protested over air pollution, and in 2025 the NAACP threatened to sue xAI under the federal Clean Air Act. Colossus 2, in the Whitehaven area of Memphis, came online in early 2026, powered by a gas plant across the state line in Southaven, Mississippi. In February 2026 xAI merged with SpaceX, and in May SpaceX leased all of the first Colossus to Anthropic, more than 300 megawatts and over 220,000 GPUs, since Grok was by then being trained on Colossus 2. Together, the Memphis and Southaven buildings provided about a gigawatt of compute by mid-2026.
In the episodes
4- November 18, 2026"⚡️Anthropic: Know Before You IPO — Tanay Jaipuria, Wing VC"mentionedLatent Space
- 49:00Tanay singles out the SpaceX compute contract as the one Anthropic commitment that isn't binding.
- October 30, 2026Anthropic S-1 Shocker, Greatest Business Ever? Google's $500B Wipeout, Midterm PredictionsmentionedAll-In
- 13:00the supercomputer that earns SpaceX $1.25 billion a month
- October 15, 2026Jensen Huang | Does AI Revenue Justify Capex, '27 AI Bottlenecks, Singularity, Open vs Closed & morementionedBG2Pod
- 55:19the couple hundred thousand Hoppers Musk stood up in Memphis
- June 11, 2026The SpaceX IPO, Fable 5, AI Capex Update & Market Check w/ Gavin Baker, Andrew Fox & Clark Tang | BG2mentionedBG2Pod
- 02:53xAI's supercomputer: a 55% IRR and a 122-day build